وب سایت تخصصی شرکت فرین
دسته بندی دوره ها

Learn How Buildings Are Constructed (Part 1 Of 2)

سرفصل های دوره

1 - Introduction to Building Construction and Building Regulations
  • 1 - Importance of Learning about Construction
  • 2 - Basic Workflow of a Construction Project
  • 3 - Can we construct any building wherever deemed possible
  • 4 - Building Regulations Governing Bodies and Building Construction Codes
  • 5 - International Building Codes and Energy Codes
  • 6 - Importance of Seismic Resistant Codes for Building Safety
  • 7 - Classification of Construction Sector

  • 2 - Seven Stages of Construction Project and their Implementation
  • 8 - Stage 1 Planning and Approvals from Authority having Jurisdiction
  • 9 - Stage 2 Financial Planning Safeguards and Contingency Plans
  • 10 - Stage 3 Legal and Contract Agreements
  • 11 - Stage 4 Procurement Design Bid Build Projects
  • 12 - Stage 4 Procurement Design Build Projects Contractor Led and Architect Led
  • 13 - Stage 567 Structural Design On site Construction and Commissioning

  • 3 - List of Professional involved in Building Construction Their Roles and Fees
  • 14 - Hard Hat Professionals Carpenter Electrician Welder Mason etc
  • 15 - Architects Scope Fees and Licensing Requirements
  • 16 - Civil Engineers Structural Engineers Project Managers and their Scope

  • 4 - Soil Testing Excavation and Shoring Methods used in the Construction
  • 17 - Classification of Soil as per Codes and How to assess the type with naked eye
  • 18 - Why Soil Investigation is Required and How to decide the Inputs for testing
  • 19 - Thumb Rules for approximate Depth of Bore Holes required for investigation
  • 20 - Methods of Taking Disturbed and Undisturbed Samples of Soil for Testing
  • 21 - Standard Penetration Test Cone Penetrometer Test & Why we dig deep into ground
  • 22 - Frost Depth Ground Water Table and Plate Load Test
  • 23 - Understanding Sample Geotechnical Report Practical Example
  • 24 - Thumb rules to differentiate sand and clay at site
  • 25 - What if client does not want a geotechnical report
  • 26 - How to do the Backfilling and Compaction at the site
  • 27 - Civil Excavation and Structure Excavation including Equipments for Excavation
  • 28 - Slope Cutting Soil Benching and Understanding Angle of Repose
  • 29 - Understanding Trench Shoring Arrangement
  • 30 - Understanding Steel Soldier Piles Shoring Arrangement
  • 31 - Understanding Soil Nailing System for Shoring
  • 32 - Understanding Secant Pile Wall System for Shoring
  • 33 - Understanding Sheet Piling system for Shoring
  • 34 - Introduction to SlurryDiaphragm walls for Shoring
  • 35 - How to do Dewatering During Construction

  • 5 - Demolition Mass Grading and Setting out of the Buildings
  • 36 - What is meant by Demolition and Deconstruction
  • 37 - Mass Grading and Controlling Soil Erosion
  • 38 - Setting out of building Horizontal control and Vertical Control
  • 39 - Temporary Shoring and Site Office Installation
  • 40 - Drilling and Blasting for Tunnels

  • 6 - Building Foundation and Types
  • 41 - Why Foundations are Required
  • 42 - Introduction to the Types of Foundations
  • 43 - Types of Shallow foundation
  • 44 - Introduction to Frost depth and Frost Heaving
  • 45 - Why Buildings should never rest on back filled soil
  • 46 - Significance of Crawl Space below the houses
  • 47 - Foundation of Buildings on Hills and Eccentric Foundations
  • 48 - Introduction to Caissons and Pile Foundation
  • 49 - Method statement for bored RCC Piling
  • 50 - Role of Bentonite Slurry and How to make Pile Steel Cage
  • 51 - Understanding Pile Caps and Types
  • 52 - What is meant by Precast Piles and What are the Specifications
  • 53 - Raker Piles Pile Driving Rigs and Types

  • 7 - EXTRAS Introduction to Retaining Walls and Design loads during Construction
  • 54 - Types of Retaining Walls and their Stability
  • 55 - Design Loads during Construction
  • 53,700 تومان
    بیش از یک محصول به صورت دانلودی میخواهید؟ محصول را به سبد خرید اضافه کنید.
    خرید دانلودی فوری

    در این روش نیاز به افزودن محصول به سبد خرید و تکمیل اطلاعات نیست و شما پس از وارد کردن ایمیل خود و طی کردن مراحل پرداخت لینک های دریافت محصولات را در ایمیل خود دریافت خواهید کرد.

    ایمیل شما:
    تولید کننده:
    شناسه: 9067
    حجم: 8887 مگابایت
    مدت زمان: 680 دقیقه
    تاریخ انتشار: 15 فروردین 1402
    طراحی سایت و خدمات سئو

    53,700 تومان
    افزودن به سبد خرید