وب سایت تخصصی شرکت فرین
دسته بندی دوره ها
3

Certified TPM Practitioner: in Building Lean Enterprises

سرفصل های دوره

Certified Total Productive Maintenance Practitioner: in Building Lean Enterprises, Training and Certification program


1 - Introduction to TPM
  • 1 - Course Introduction
  • 2 - What is TPM

  • 2 - The Eight pillars and the Five elements of TPM
  • 3 - The Eight pillars of TPM
  • 4 - The Five key elements of TPM
  • 5 - The Difference between pillars and the elements

  • 3 - Managing activities in a TPM program
  • 6 - Understanding and managing activities in a TPM program
  • 7 - Different types of Maintenance Planned Unplanned Corrective RCM and etc
  • 8 - SMED Single Minute Exchange Die
  • 8 - SMED-Process-Design.xlsx

  • 4 - TPM and OEE
  • 9 - The six big losses in Manufacturing
  • 10 - The OEE and calculating OEE
  • 11 - Computerized OEE calculation
  • 11 - OEE-calculator-weekly-basis.xlsx
  • 12 - World class manufacturing standards and OEE

  • 5 - TPM Implementation
  • 13 - Introduction to Implementing TPM in a Plant
  • 14 - Learning about Kurt Lewins Change model to Implement TPM
  • 15 - Implementing TPM Part 1 The Unfreeze Stage
  • 16 - Implementing TPM Part 2 Change Stage
  • 17 - Autonomous-Maintenance-Plan.xlsx
  • 17 - Implementing TPM Part 3 Refreeze stage and How to create Maintenance Plans
  • 17 - Planned-Maintenance-Plan.xlsx
  • 17 - TPM-Implementation-Plan-Corn-Processing-Factory.xlsx
  • 18 - TPM Implementation Audits
  • 18 - TPM-Audit-1-Implementation.xlsx
  • 19 - Post TPM Implementation Audits
  • 19 - TPM-Audit-2-Post-Implementation.xlsx
  • 20 - Maintenance cost analysis

  • 6 - Problem solving in a TPM environment with Lean Tools
  • 21 - The CauseEffect diagram for problem solving
  • 22 - The WhyWhy analysis

  • 7 - Using 5S for TPM
  • 23 - The concept of using 5S for TPM
  • 24 - 5S-Red-Tag-v1.zip
  • 24 - Achieving Sort and Set in order
  • 25 - Achieving Shine
  • 26 - Achieving Standardize and Sustain
  • 26 - The-5S-Audit-Form.xlsx
  • 26 - The-5S-Communication-Board.xlsx
  • 27 - Plant Safety
  • 27 - Risk-Rating-Format.docx
  • 28 - Using the 5S elements for TPM

  • 8 - The benefits of TPM in a Plant
  • 29 - Identifying the benefits of implementing TPM in a Plant

  • 9 - What is Lean Manufacturing
  • 30 - Introduction to Lean Manufacturing and Lean Enterprises

  • 10 - The Final Lecture
  • 31 - How to obtain your certificate and your badge
  • 31 - TPM-Exam-Uploaded.zip
  • 139,000 تومان
    بیش از یک محصول به صورت دانلودی میخواهید؟ محصول را به سبد خرید اضافه کنید.
    افزودن به سبد خرید
    خرید دانلودی فوری

    در این روش نیاز به افزودن محصول به سبد خرید و تکمیل اطلاعات نیست و شما پس از وارد کردن ایمیل خود و طی کردن مراحل پرداخت لینک های دریافت محصولات را در ایمیل خود دریافت خواهید کرد.

    ایمیل شما:
    تولید کننده:
    شناسه: 8786
    حجم: 1975 مگابایت
    مدت زمان: 187 دقیقه
    تاریخ انتشار: ۱۰ فروردین ۱۴۰۲
    طراحی سایت و خدمات سئو

    139,000 تومان
    افزودن به سبد خرید